Plain-language guides for superintendents, masters and chief engineers: maintenance, crew, environment, safety and dry-docking.
Why every ship needs a PMS, what section 10 of the ISM Code asks for, and the parts of a PMS that inspectors look at first.
How to choose between hour-based and calendar-based jobs, how grace periods work, and why stale counters are dangerous.
The 10-hour and 77-hour limits, the two-period rule, exceptions for drills and emergencies, and what records port State control asks for.
How the Carbon Intensity Indicator is calculated, what the reduction factors to 2030 mean, and what to do with a D or E rating.
Which voyages count, the 40 / 70 / 100 % phase-in, what changes in 2026, and how to estimate the allowances you need.
The garbage categories A–K, the distances for food waste and cargo residues, special areas, and how to record each operation.
What changed on 1 February 2025, the codes A to H, and how to record BWMS failures and contingency measures.
The Hong Kong Convention is in force since 26 June 2025. What the IHM contains, who needs it, and how to keep it up to date with MD and SDoC.
From the survey dates to the final invoice: what to do 12, 6, 3 and 1 month before docking, during the docking and after it.
Since 2020 MARPOL allows electronic record books approved by the flag. What a compliant system must do, and what to keep on paper until then.
Why enclosed spaces kill, the atmosphere limits to test for, and how a permit-to-work system keeps the checks honest.
What to check before you buy: offline use, data you can take out, class acceptance, the people who will use it and the total cost.
The dates that matter: sulphur cap, CII, EU ETS, FuelEU, the new ballast water record book, the Hong Kong Convention and the IHM deadline.
41 terms from AER to variation order, explained in one or two lines.
A 45-minute online demo with sample vessels, built around what matters to you.